Skip to main content
Cabrillo Plumbing, Heating & Air

Cabrillo Project · Noe Valley, San Francisco · Heat Pump Installation

8-zone Mitsubishi Hyper-Heat retrofit in a 3-story Noe Valley Victorian

1903 three-story Victorian, ~2,600 sq ft, previously ductless

Draft — awaiting Cabrillo photography & customer consent

Photography pending — Cabrillo owes real jobsite photos before publish.

The customer's problem

Homeowners had lived with wall heaters and window ACs for 20 years — top floor was always 10°F hotter than the ground floor in summer, and space-heater winters. They wanted whole-home heat + AC without demolishing plaster to run ductwork.

The Cabrillo solution

Installed an 8-zone Mitsubishi MXZ multi-split with one exterior condenser (mounted on the light well) feeding eight indoor heads — six wall-mount slim-line units in bedrooms and living spaces, plus two ceiling cassettes in the ground-floor open plan. Line sets ran through a decommissioned dumbwaiter chase, so the only wall opening required was 3 inches per head.

Equipment installed

Brand Model Role
Mitsubishi MXZ-8C48NAHZ2 (48kBTU H2i condenser) Outdoor unit
Mitsubishi MSZ-FS wall-mount (×6) Bedrooms & living
Mitsubishi PLA-A ceiling cassette (×2) Ground floor
Mitsubishi kumo cloud wireless controller Zone thermostat control

What the homeowner got

  • Whole-home heating AND cooling from one system for the first time
  • Every floor holds within 2°F of setpoint
  • Full-home heat load handled below 5°F outdoor (H2i cold-climate)
  • Qualified for BayREN + PG&E heat-pump rebates
Duration
9 days (2 crew members, 3 days indoor rough-in, 4 days line-set + head hang, 2 days commissioning + walkthrough)
Financing
GreenSky 0% APR for 24 months on qualifying equipment
Service
Heat Pump Installation
Location
Noe Valley, San Francisco

Project facts

"First summer in this house we didn't sleep with the windows open. First winter we didn't hear the space heaters kick on at 3 a.m." — [DRAFT — replace with real review or delete]